Temporarily Closure Of Penang Bridge On Nov 26 For PBIM 2017

105

Categories:

PETALING JAYA, Nov 20 – The Penang Bridge will be temporarily closed on Nov 26 from 12am and 10am to make way for the Penang Bridge International Marathon 2017, PLUS Malaysia Bhd (PLUS) said in a statement.

PLUS advises the public to use the 24 hours ferry services or the Sultan Abdul Halim Muad’zam Shah Bridge (Second Penang Bridge) as alternatives to commute in or out of the island. The highway concessionaire also advises the public to follow all on-site instructions during the bridge closure.

0
like
0
love
0
haha
0
wow
0
sad
0
angry
  • Rescue On-Going https://t.co/pBxe16Tpvo Oct 20, 2018
  • A landslide occurred in Bukit Kukus in Paya Terubong this evening. 1 Survived, 2 Death, 12 Missing in the incident. (PN Images/JohnShen Lee) Oct 19, 2018
  • A landslide occurred in Bukit Kukus in Paya Terubong here today. According to state exco member Phee Boon Poh, thre… https://t.co/PSJfsy8MEe Oct 19, 2018

error: Content Is Protected !