Penang Bridge Slow Lane Closed In Stages Until August 30

48

Categories:

GEORGE TOWN, Aug 10 – The slow lane at several locations along the Penang Bridge will be closed in stages until Aug 30 to enable routine inspection and maintenance work.

The highway concessionaire PLUS Malaysia Berhad (PLUS) announced in a statement today that the routine inspection and maintenance work under the Penang Bridge will be conducted between 11 am and 3 pm daily except Saturdays, Sundays and public holidays.

PLUS said the inspection and maintenance work routine was not related to the scheduled Penang Bridge cable inspection and maintenance work which was completed on July 31.

In this regard, PLUS advises Penang Bridge users to plan their journey and comply with all signage and instructions given. Users are also advised to follow the PLUSTrafik Twitter website or download the PLUS Mobile App to get the latest traffic update on the Penang Bridge as well as all PLUS highways. — Bernama

0
like
0
love
0
haha
0
wow
0
sad
0
angry
  • No SST For Construction Services, Some Building Materials https://t.co/0rQxQOgcmU Aug 12, 2018
  • PKR Polls: Rafizi Wants ‘Brotherly Spirit’ To Prevail https://t.co/Ys5XOUvHle Aug 12, 2018
  • IGP: PDRM Are Still Hunting For Jho Low https://t.co/SMY2wAlW8u Aug 12, 2018

error: Content Is Protected !